Commercial Office Building At Delhi Jaipur Highway Gurgaon For Lease

  • ₹ 1,19,28,000
  • ₹ 42/Sqft Month
Sector 34-35
Commercial Building Rent-Lease
Commercial Office Building At Delhi Jaipur Highway Gurgaon For Lease
Sector 34-35
  • ₹ 1,19,28,000
  • ₹ 42/Sqft Month
*Pictures shown are for illustration purpose only. *दिखाए गए चित्र केवल उदाहरण के उद्देश्य के लिए हैं।

Overview

  • Commercial
  • Property Type
  • 450
  • Garages
  • 284000
  • Sq Ft
  • 2020
  • Year Built

Description

Commercial Office Building at Delhi Jaipur Highway Gurgaon for lease 

Lease-able Sqft upto 2,84,000, at INR 42/- Per Sqft .
450 car parking  .
Basement 1.5lakh sqft ,
2Acre, Highway facing. HSIDC allotted plot .
Leed green building, with 100% ac power backup .

Plot no 2-3
Near Toyata Showroom .
Udyog Vihar Phase 7.
Sector 34-35, Gurgaon .

Strategically located on the main Gurgaon expressway, (Delhi Jaipur Highway) Fortune Questa, a premier commercial office building offers immense publicity and brand equity for the prospective occupant. Access to the property on account of it’s location, on the NH8 (Delhi Jaipur Highway) is extremely fast for employees traveling from Delhi, Gurgaon, Faridabad and the Domestic & International Airport. A responsible business space that offers state-of-the-art infrastructure and amenities.

GREENZ Commercial Office Building.
A responsible business space that offers state-of-the-art infrastructure and amenities, in a stylish and contemporary architectural design, while maintaining harmony with the enviornment.

Fortune Questa aspires to be a LEED Certified Green Building. The building has the following unique features which enable huge savings in the monthly energy and water bill.

The entire glass facade on elevation is high performance toughened double glass from Saint Gobain. The U value and the SHGC has been controlled to reduce the heat entering the building, while there is no compromise in the natural light passing through the glass envelope.
XPS Sheets of Owens Corning have been fixed on the terrace to reduce the heat impact from the terrace.
HVAC Chillers from Trane USA having COP of 6.15 (highest globally for this size of Chillers).
Heat Recovery Wheels installed to substantially reduce energy costs on a monthly basis.
Variable Frequency Drives (VFD) installed in all secondary pumps in HVAC System.
VFD installed in Air Handling Units (AHU) for substantial reduction in energy consumption.
All pumps and motors have class 1 efficiency to reduce energy cost.
STP Plant installed. 50% of the water to be used for AC Plant balance quantity to be used for Horticulture and Flushing.
Rain Water Harvesting at 4 places for 100% recharging of the rain water to the subsoil.
All elevators from Schindler, Sweden having latest gearless technology resulting in considerable energy savings.

Technical Specifications Commercial Office Building.
General
The entire building envelope has been optimized by choice of materials and providing insulation wherever applicable. The thermal characteristics of envelope are as follows :
Insulated roof using extruded polystyrene to achieve low overall thermal heat transfer coefficient .
Double insulated glass .
Provision of ample natural lighting to optimize artificial lighting .

HVAC System Commercial Office Building.
Central air conditioning system consist of low power consuming water cooled/air cooled machine.
Variable Speed Chilled Water Pumping System to conserve pump operation power.
Use of High efficiency Blowers in HVAC system.
Provision in Air Handling Unit motors to install variable frequency drives by individual tenants.
Indoor air quality. Fresh air quality in line with LEED requirements for enhanced ventilation i.e. 17 CFM/Person.
Superior noise and vibration control measures to prevent disturbance to tenant operations.
Use of R134 a refrigerant and high COP screw chillers to increase energy savings.
Installation of treated fresh air units with heat recovery wheels in order to conserve energy without compromising indoor air quality. In line with LEED requirements & energy savings
Use of a minimum of 50% of the total cooling tower, make up water from STP treated water.
The interior lighting loads are designed to not exceed 0.9 watts/sq.ft average lighting power densities for all areas with a maximum density of about 1.1 watts/sq.ft. or office areas and 0.4 -0.5 watts/sq.ft. in service and other common areas.
All chemical/house keeping/laundry areas/printing/copying rooms would be exhausted sufficiently to create negative pressure with respect to adjacent spaces thru’ the doors. Deck to deck partitions or a hard-lid ceiling. The exhaust rate shall be at least 0.50 cfm/sqft with no air re-circulation. The pressure differential with the surrounding spaces shall be at least 5 pascal on average and 1 pascal at a minimum when the doors to the rooms are closed

Electrical System Commercial Office Building.
11KV incoming power supply from Haryana State Electricity Board grid.
Transformers with on-load tap changers provided for superior voltage regulation.
All HT equipment like HT breakers and transformers shall be located away from building to avoid affect of electromagnetic radiations.
LV Power supply duly terminated at each floor through solid conductor rising mains with a suitable rating tap-off box.
Dual supply energy meters at each floor for metering city and Dg power separately.
Power factor to be maintained as 0.92 and above. All capacitors provided with Harmonic Filters to avoid distortion in Voltage i.e. Clean Power will be available to Tenants.
Dedicated risers for electric and Communication facilities on each floor with due consideration for avoiding electromagnetic radiations.
100% Power Backup by Diesel generator Sets provided with PLC based auto synchronization load management.
Use of high efficiency motors for all moving equipment.

Internal Lighting Commercial Office Building.
As per the green Building requirements, FDS is required to restrict lighting power densities even in the tenant spaces. The interior LPD recommended is 0.9W/sq.ft.

External Lighting Commercial Office Building.
The LPD for external lighting is as follows :
Fittings have been selected such that the no upward lighting shall be there. Provision of cut-off luminaries, low-reflectance surfaces and low-angle spotlights to reduce light pollution.
No light would leave the boundary. Location of external light fittings inside the boundary is such that no light from the fixtures goes beyond the building boundaries.

Electrical Metering Commercial Office Building.
Base Building Metering : Separate metering to measure the following has been provided.
Lighting System & Controls
Constant & variable motor loads
Variable frequency drives (VFD) operation especially in chillers (to monitor the chiller efficiency at variable loads)
Water flow meters in indoor water risers & outdoor irrigation systems.

Tenant Sub Metering
Each Tenant space would have a separate meter to measure the total electricity consumption by that tenant specifically in his space.

Public Health Engineering
Nearly two days of water storage at site
Provision of treated water supply on each floor
Sewage Treatment Plant for recycling the sewerage and use of recycled water generated for make-up to the AC & DG cooling towers
Ground water recharge by harnessing the rainfall on site
Low water flow fixtures and fittings in toilets
Plumbing fixtures, WCs, urinals and hand wash shall conserve minimum 25% water as compared to regular water fixtures
The flow rates are in consideration with WCs, urinals, hand wash and sinks. Provision of low flow fixtures for showers
100% of waste water treated to tertiary standards, in accordance with LEED. This treated water is used for landscaping first and then for toilet flushing. DG cooling, AC make-up etc
Provision of Rain Water Harvesting Pits in size and quantity fulfills the requirement of post construction run-off being equal to pre-construction run-off

Fire Safety
Provision for tenants to lay their independent sprinkler line on each floor above false ceiling sprinklers
Wet Riser System with Fire Hose Cabinets at each emergency fire escape staircase
External Hydrant System
Automatic Fire Detection and Alarm system

Video

  • Address Gurugram
  • City Gurugram
  • State/county Haryana
  • Zip/Postal Code 122001
  • Area Delhi Jaipur Highway
  • Country India

Contact Information

View Listings

Enquire About This Property

Compare listings

Compare
Hans Kumar
  • Hans Kumar
Open chat
1
Open To WhatsApp Chat
Request Info